101.03 LOST AND FOUND ARTICLES 08/24/16 | 181.33 KB |
101.15 WARRANTY MANAGEMENT PROCEDURE 05/08/18 | 112.6 KB |
101.18 YARD ACCESS GATE VEHICLE SPIKE STRIP 05/22/09 | 327.56 KB |
101.19 NON-REVENUE VEHICLES FUELING 12/11/15 | 314.89 KB |
101.37 MAINTENANCE OF NON-REVENUE VEHICLES 05/14/97 | 186.25 KB |
102.07 LRV LUMINATOR SIGN OPERATION 07/10/05 | 136.06 KB |
102.12 OPERATION OF LRV SILENT ALARM 06/15/05 | 213.59 KB |
102.20 GUIDE TO THE SD100 CAR 10/15/99 | 232.88 KB |
102.22 CENTRAL CONTROL UNINTERRUPTED POWER SUPPLY 03/14/06 | 113.56 KB |
102.29 TROUBLESHOOTING THE S70 LRV 03/04/05 | 151.18 KB |
102.30 ENVITECH AUTOMATIC ANNOUNCEMENT SYSTEM 07/01/05 | 208.32 KB |
101.38 INSPECTION OF INTERNATIONAL 4300 RERAIL TRUCK 04/12/16 | 269.55 KB |
103.14 HIGH WATER INDICATOR SYSTEM 03/04/05 | 143.09 KB |
103.17 FIRE INDICATOR SYSTEM 03/04/05 | 151.02 KB |
103.18 TRESPASSER INTRUSION INDICATOR SYSTEM 03/04/05 | 175.21 KB |
104.06 EMERGENCY TRIP SWITCH SDSU TUNNEL 03/04/05 | 114.59 KB |
105.05 YARD OPERATION 08/04/03 | 272.34 KB |
105.08 WHEELCHAIR PLACEMENT ONBOARD TRAINS & DIRECTIONAL S/D SERVICE 02-14-16 | 247.78 KB |
105.13 TRAIN-TO-WAYSIDE CONTROL (TWC) 09-02-12 | 272.08 KB |
105.31 LIMITED JOINT OPERATION BETWEEN SDTI LIGHT RAIL TRAINS LRT SDIV FREIGHT TRAINS 07/10/05 | 212.19 KB |
106.04 EARTHQUAKE EMERGENCY AND INSPECTION 03/04/05 | 93.21 KB |
106.09 WORK CREW/PREDESTRIAN TRAFFIC AT GRADE SEPARATED LOCATIONS 03/04/05 | 122.3 KB |
106.19 SDGE CONTROLLED REGIONAL POWER OUTAGES 06/15/05 | 181.16 KB |
106.22 SDSU TUNNEL AND UNDERGROUND STATION EMERGENCY SYSTEMS AND ALARMS 03/04/05 | 260.81 KB |
107.06 LRV PASSENGER CAB INTERCOM SYSTEM 07/01/05 | 358.52 KB |
1001.15 AUTOMATED EXTERNAL DEFIBRILLATOR 01/17/13 | 387.27 KB |
E-2000 CHANGING LABYRINTH RINGS 04/16/98 | 198.98 KB |
E-2001 EFFECTIVE DOOR TROUBLESHOOTING 04/16/98 | 175.87 KB |
E-2009 LRV VENT WINDOW REPAIR 04/16/98 | 123.04 KB |
E-2010 REMOVAL/INSTALLATION OF PASSENGER WINDOW 04/16/98 | 280.27 KB |
E-2011 PRESSING ON TIRES 04/16/98 | 110.35 KB |
E-2013 SHOP POWER AND RED TAG PROCEDURES 09/28/15 | 299.18 KB |
E-2014 LRV HEADLIGHT AND AUXILIARY HEADLIGHT ADJUSTMENT 05/20/98 | 114.05 KB |
E-2015 CORRECT USE OF OUTER WHEEL THICKNESS GAUGE 05/20/98 | 175.22 KB |
E-2016 PROCEDURE FOR ESTIMATING MAXIMUM TONS OF FORCE DURING WHEEL PRESS 05/21/98 | 182.89 KB |
E-2017 PROPER INSTALLATION OF PANTOGRAPH CARBONS 05/21/98 | 116.02 KB |
E-2018 PREVENTATIVE MAINTENANCE FOR HOESCH RERAIL EQUIPMENT 09/30/97 | 978.6 KB |
E-2020 SAFE OPERATION OF JIB CRANE 05/22/98 | 50.74 KB |
E-2021 PROPER CAR OF EQUIPMENT 05/22/98 | 149.02 KB |
E-2024 WHEELTRUING 08/12/16 | 959.33 KB |
E-2026 GLASS REPLACEMENT WORK 05/22/98 | 61.38 KB |
E-2029 PANTOGRAPH REPAIR ADJUSTMENT AND INSTALLATION 05/29/98 | 299.73 KB |
E-2030 HEGENSCHEIDT PRE-OPERATION INSPECTION MONTHLY, BI-ANNUAL AND ANNUAL INSPECTIONS 07/28/15 | 280.54 KB |
E-2032 LRV CAR WASH MAINTENANCE INSPECTIONS | 558.74 KB |
E-2037 LRV SHOP MOVEMENTS OF LRVS 05/29/98 | 74.08 KB |
E-2038 BLUE FLAG PROCEDURE 4/5/17 | 74.6 KB |
E-2039 PROCEDURE FOR DAILY CLEANING OF LRVS 02/02/00 | 229.7 KB |
E-2040 PROCEDURE FOR USING MANLIFT IN LRV MAINTENANCE FACILITY 06/02/98 | 53.42 KB |
E-2042 PREVENTATIVE MAINTENANCE PROCEDURE FOR SHOP EQUIPMENT 07/07/99 | 1.05 MB |
E-2043 LRV CLEANING PROCEDURE 06/17/98 | 441.57 KB |
E-2044 BOGIE BODY HOIST OPERATING PROCEDURE 07/28/98 | 703.71 KB |
E-2045 PROCEDURE FOR INSPECTION OF THE RICON S-SERIES WHEELCHAIR LIFT 03/04/10 | 847.25 KB |
E-2049 INSPECITON OF LRVS DURING STADIUM EVENTS 09/02/09 | 144.94 KB |
E-2050 DAILY INSPECTION OF SD100 LRV SERIES 02/02/00 | 184.27 KB |
E-2051 7.5K INSPECTIONS OF SD100 LRV SERIES 03/01/10 | 920.07 KB |
E-2052 ACCUMULATOR PRESSURE CHECKS AND CHARGING SD100 LRV SERIES 06/14/17 | 324.28 KB |
E-2053 BLEEDING AND FLUSHING CALIPERS SD100 LRV SERIES 07/15/98 | 1.19 MB |
E-2054 FILLING, INSPECTION AND OPERATION OF HAND PUMP FOR LRV FRICTION BRAKE 6/21/17 | 170.6 KB |
E-2055 FLUSHING HYDRAULIC TUBING ON SD100 LRV SERIES 07/27/98 | 1.32 MB |
E-2056 PREPERATION AND USE OF FILLING UNIT STU 13467 FOR SD100 LRV SERIES 08/10/98 | 463.21 KB |
E-2057 OPERATION AND USE OF FLUSHING UNIT STU 13473 FOR SD100 LRV SERIES 08/11/98 | 370.28 KB |
E-2058 DRAINING, FILLING AND BLEEDING OF ELECTRO-HYDRAULIC UNIT FOR SD100 LRV SERIES 08/13/98 | 1.09 MB |
E-2059 ONE YEAR INSPECTION OF SD100 LRV SERIES 01/07/00 | 893.99 KB |
E-2062 BRAKE FAULT INDICATION LAMP ON SD100 LRV SERIES 08/09/99 | 75.83 KB |
E-2063 22.5K INSPECTION OF SD100 LRV SERIES 03/01/10 | 275.17 KB |
E-2076 PASSENGER EMERGENCY INTERCOM SYSTEM OPERATION 02/02/01 | 241.94 KB |
E-2081 PROCEDURE FOR PLACING LRVS OUT OF SERVICE 05/08/02 | 165.43 KB |
E-2082 LRV TIRE RESISTANCE TESTING PROCEDURE 09/18/03 | 140.74 KB |
E-2083 USE OF THE CELLTOPPER NI-CAD BATTERY FILLING EQUIPMENT 04/14/04 | 138.23 KB |
E-2084 TIRE PRESS OPERATING PROCEDURE 10/18/05 | 839.55 KB |
E-2085 SD7 AND SD8 BATTERY REFILLING 12/12/12 | 265.96 KB |
E-2090 CONTRACT CLEANING OF LRVS IN YARD 04/09/14 | 144.13 KB |
E-2107 1 GATOR UTILITY VEHICLE MODEL TE 03/07/08 | 1.23 MB |
E-2201 S70 COMPUTER DOWNLOAD PROCEDURE 08/23/05 | 130.71 KB |
E-2207 S70 WHEELTRUING PROCEDURE 06/13/06 | 165.35 KB |
E-2301 MONTHLY INSPECTION OF PCC STREETCAR 02/29/12 | 965.42 KB |
E-3000 BACK SUPPORT BELT AND LIFTING PROCEDURE 06/26/98 | 157.29 KB |
E-3001 SAN DIEGO TROLLEY INC PERMITS 12/14/99 | 193.42 KB |
E-3002 SELECTION, USE AND CARE OF RESPIRATORS 06/29/98 | 282.46 KB |
E-3003 JLG LIF OPERATING PROCEDURE 06/30/98 | 1.17 MB |
E-3005 FLUKE 73 INSPECTION PROCEDURES 07/06/98 | 287.02 KB |
E-3006 PROCEDURES TO SAVE AND CLEAR SD100 SIBAS 16 FAULTS 07/07/98 | 407.67 KB |
E-3008 CALIBRATION OF TORQUE WRENCHES, METERS AND SHOP TOOLS 08/10/16 | 69.67 KB |
E-3009 PROCEDURES FOR TOSHIBA LAPTOP COMPUTERS 01/17/96 | 293.45 KB |
E-3010 UNINTERRUPTIBLE POWER SUPPLY UPS FOR CENTRAL CONTROL RADIO POWER 02/15/99 | 386.37 KB |
E-3011 MEASURING TIRES WITH AAR GAGE MODEL W600-4A 07/10/03 | 929.97 KB |
E-3012 LRV MAINTENANCE REFERENCE COMPUTERS 09/25/08 | 1.09 MB |
E-4001 DAILY INSPECTION OF S70 US LRV 02/26/14 | 326.94 KB |
E-4002 7.5K INSPECTION OF S70 US LRV 12/04/13 | 1.35 MB |
E-4003 15K INSPECTION OF S70 US LRV | 848.63 KB |
E-4004 30K INSPECTION OF S70 US LRV 08/08/15 | 673.39 KB |
E-4005 60K INSPECTION OF S70 US LRV 08/08/15 | 645.34 KB |
E-7021 PROCEDURES FOR SAFE CLEANING AND HANDLING OF ENVIRONMENTAL HAZARDS 01/31/05 | 115.55 KB |
E-7022 HAZARDOUS MATERIAL HANDLING AND CLEANUP PROCEDURES 01/31/05 | 135.9 KB |
E-7023 LRVS MAIN LINE RECOVERY PROCEDURES 11/23/06 | 526.26 KB |
E-7024 INTERIOR DOOR OPERATION PAINT BOOTH FACILITY 02/02/07 | 60.18 KB |
E-7025 SANDBLASTING CABINET GRIZZLEY MODEL G0472, G0473, G0476 SAFETY AND OPERATIONS 01/11/98 | 375.67 KB |
E-8000 KRV SHOP TOOL CHECK OUT | 101.76 KB |
101.09 EMPLOYEE PERSONAL INJURIES 04/05/17 | 453.57 KB |
106.20 ON-TRACK HY-RAIL NON-SHUNTING TRACK MAINTENANCE WORK EQUIPMENT 05-12-17 | 268.1 KB |
105.10 TRAIN OPERATION SDTI YARD 06-19-17 | 426.21 KB |
101.17 SUPERVISORS' USE OF CELLULAR TELEPHONES 12-31-14 | 54.07 KB |
102.08 RICON LIFT OPERATION 09-02-12 | 174.14 KB |
102.10 TWO-WAY RADIO COMMUNICATION SYSTEM 06-20-08 | 85.9 KB |
102.40 INTERALIA AUTOMATIC ANNOUNCEMENT SYSTEM 03-29-17 | 382.32 KB |
104.01 TRACTION POWER DISTRIBUTION SYSTEM 10-16-15 | 394.78 KB |
102.33 OPERATION OF MIXED CONSISTS (SD100-S70-S70US) | 165.56 KB |
E-2065 Brake Equipment Pressure Test SD100 | 194.58 KB |
SOP E-5001 S70 US (SD9) Daily Instruction 02-13-19 | 178.18 KB |
102.26 SOP U2 LRV RETRACTABLE STEP DISABLE FEATURE 06-11-19 | 179.74 KB |
101.27 SOP Use of Personal Electronic Devices While On-Duty 05-20-19 | 139.25 KB |
E-2036 SOP LRV MAINTENANCE FACILITY EMERGENCY RESPONSE 06-11-19 | 663.63 KB |
E-2003 6 MONTH OIL CHANGE OF LRV's 06-25-19 | 168.64 KB |
E-2002 DAILY INSPECTION OF U2 LRV 06-23-19 | 304.14 KB |
E-2004 6 MONTH INSPECTION OF U-2 LRV 06-21-19 | 575.11 KB |
10-03-19_hywema_portable_jack_lift_operation.pdf | 149.37 KB |
E-5002 S70 US SD9 7.5K INSTRUCTION 02-13-2019 | 769.9 KB |
E-4006 SOP S70-S70 US ANUAL MAINTENANCE INSPECTION 10-16-19 | 1.23 MB |
E-5004 SOP 30K INSPECTION OF SD9 LRVS 10-10-19 | 1.4 MB |
E-5005 SOP 60K INSPECTION OF SD9 LRV 10-14-19 | 1.46 MB |
E-5003 15K INSPECTION OF S-70 US 5000 SERIES LRV 06-17-19 | 780.41 KB |