- Achieve a favorable Rail Operations - Transportation department expense budget variance (excluding energy) for fiscal year 2017.
- Achieve on time performance targets for System Wide, Blue Line, Orange Line, and Green Line with a 25% value placed on each dependent and interdependent element of the goals.
- System-wide inclusive of all three lines of 96% = 25%
- Blue Line 95% = 25%
- Orange Line 95% = 25%
- Green Line 95% = 25%
- Reduce the number of preventable train accidents compared to fiscal year 2016 levels.
- Reduce the number of operating rule infractions as compared with the level achieved during fiscal year 2016.